登录    注册    忘记密码

详细信息

地震动持时对自复位预应力混凝土框架动力响应的影响    

Investigation on the Influence of Ground Motion Duration on the Seismic Response of Self-Centering Prestressed Concrete Frames

文献类型:期刊文献

中文题名:地震动持时对自复位预应力混凝土框架动力响应的影响

英文题名:Investigation on the Influence of Ground Motion Duration on the Seismic Response of Self-Centering Prestressed Concrete Frames

作者:孙小云 曾滨 许庆 黄林杰 魏洋 周臻 谢钦 郑开启

第一作者:孙小云

机构:[1]南京交通职业技术学院,南京211188;[2]中冶建筑研究总院有限公司,北京100088;[3]南京林业大学土木工程学院,南京210037;[4]东南大学,东南大学混凝土及预应力混凝土结构教育部重点实验室,南京210096;[5]贵州理工学院土木工程学院,贵阳550003

第一机构:南京交通职业技术学院,南京211188

年份:2023

卷号:53

期号:3

起止页码:35-40

中文期刊名:工业建筑

外文期刊名:Industrial Construction

收录:CSTPCD;;北大核心:【北大核心2020】;

基金:国家自然科学基金项目(52208480、52108150);国家自然科学重点基金(52038010);江苏省“青蓝工程”资助项目;江苏省高等学校大学生创新创业训练计划项目(202012804024Y);南京交通职业技术学院高层次人才科研启动经费项目(JG1804);江苏省高校自然科学基金面上项目(22KJB560007);江苏省“双创博士”项目(JSSCBS20210553);贵州省科技计划项目(黔科合基础[2020]1Y249)。

语种:中文

中文关键词:地震动持时;自复位预应力混凝土;摩擦;可修性能

外文关键词:ground motion duration;self-centering prestressed concrete;friction;repairable performance

摘要:为研究地震动持时对具有半刚性特征的自复位预应力混凝土(SCPC)框架动力响应的影响,以一8度设防地区的摩擦耗能型SCPC框架为分析算例进行分析。利用OpenSees有限元分析软件建立其有限元模型,基于规范反应谱拟合生成2组(20条)持时分别为20 s和60 s的地震波为激励,对结构进行设防烈度地震和罕遇地震下的非线性动力时程分析。结果表明:设防烈度地震水平,持时对结构动力响应的影响较小,结构可较好地实现震后立即使用的性能目标;罕遇地震水平,短持时地震作用下SCPC框架可较好地实现震后可修的性能目标,而长持时地震会导致SCPC框架的下部楼层侧移和残余位移过大,梁柱损伤加剧,结构不易实现“大震可修”性能目标。
To investigate the influence of ground motion duration on the seismic response of self-centering prestressed concrete(SCPC)frames characterized by semi-rigidity,a friction based SCPC frame located in the area with a seismic fortification intensity of eight degree is selected as the analytical case,and its numerical model has been built.Two sets of artificial ground motions with 20 s and 60 s duration,generated based on code response spectrum,were used as the excitation for structures.The nonlinear dynamic analyses were performed on the SCPC frame under moderate and major earthquakes through finite element model of OpenSees.Results show that the ground motion duration has minor influence on the seismic response of structures under moderate earthquakes and the structures can be used immediately.Under major earthquakes,the structure can achieve the performance objective of repairable under the earthquake with short duration,while long ground motion duration may lead to larger displacement and residual deformation of lower floors,and aggravate the damage of beam and column,the objective of repairable under major earthquake is not achieved easily.

参考文献:

正在载入数据...

版权所有©贵州理工学院 重庆维普资讯有限公司 渝B2-20050021-8 
渝公网安备 50019002500408号 违法和不良信息举报中心