登录    注册    忘记密码

详细信息

Research on short wall continuous mining technology with full roof falling and roof control measures  ( EI收录)   被引量:1

文献类型:期刊文献

英文题名:Research on short wall continuous mining technology with full roof falling and roof control measures

作者:Wang, Shuli Zhu, Guangli Zhang, Kaizhi Wang, Yuchen

第一作者:Wang, Shuli

通信作者:Zhu, GL[1]

机构:[1]Shandong Univ Technol, Sch Resources & Environm Engn, Zibo 255000, Peoples R China;[2]Guizhou Inst Technol, Guiyang 550003, Peoples R China

第一机构:Shandong Univ Technol, Sch Resources & Environm Engn, Zibo 255000, Peoples R China

通信机构:corresponding author), Shandong Univ Technol, Sch Resources & Environm Engn, Zibo 255000, Peoples R China.

年份:2021

卷号:39

期号:7

起止页码:4877-4886

外文期刊名:GEOTECHNICAL AND GEOLOGICAL ENGINEERING

收录:EI(收录号:20211410182705);Scopus(收录号:2-s2.0-85103550625);WOS:【ESCI(收录号:WOS:000636916200002)】;

基金:This research was supported by National Natural Science Foundation of China (51904177) and Shandong Natural Science Foundation (ZR2019BEE078).

语种:英文

外文关键词:Short wall mining technology; Full roof falling; Measures to control roof; Forced caving technology

摘要:Short wall mining technology is an important method to coal resource mining in the United States, Australia and other countries, and also one of important methods to boundary coal resource recovery in China. Short wall mining technology through leaving a large number of coal pillars to support and control roof, induces a series of accidents, such as large area roof suspended, collapse and shock, which restricts the further popularization and application of short wall mining technology seriously. By improving the existing short wall mining technology, the article proposed short wall continuous mining technology with full roof falling, and designed measures to control roof. The main research work is as follows: (1) By reducing and eliminating coal pillars in mining section as much as possible, including entry protecting pillar and pillar between caverns, also ensured stability of roof during mining period at the same time; after mining, roof can be collapse, to prevent large area roof suspended and collapsed inducing shock accidents; mining process and equipment of short wall continuous mining technology with full roof falling, were designed comprehensively. (2) Measures to control roof of short wall continuous mining technology with full roof falling are designed, using self-moving hydraulic support to control roof of mining cavern, anchor bolt and cable to ensure branch and cross entries stable during mining period, and forced caving technology to control large area roof suspended; (3) Short wall continuous mining technology with full roof falling and roof control measures were successfully industrialized in 42,210 boundary coal face of Yujialiang coal mine, which belong to Shenhua energy group in Inner Mongolia. The research result is significant to enrich and develop short wall mining technology.

参考文献:

正在载入数据...

版权所有©贵州理工学院 重庆维普资讯有限公司 渝B2-20050021-8 
渝公网安备 50019002500408号 违法和不良信息举报中心