Mechanical characteristics and parameter optimisation for extra-large deep foundation excavation at cross-transfer subway stations  ( SCI-EXPANDED收录)  

文献类型:期刊文献

英文题名:Mechanical characteristics and parameter optimisation for extra-large deep foundation excavation at cross-transfer subway stations

作者:Wang, Zhiquan Tian, Feng Zhang, Heng Tao, Mingliang Luo, Ningxiang Wang, Zijian Liu, Chenyang Liu, Zhennan Tian, Xingchao

第一作者:Wang, Zhiquan

通信作者:Liu, ZN[1]

机构:[1]Powerchina Railway Construct Investment Grp CO, Beijing, Peoples R China;[2]Sinohydro Engn Bur 4 CO, Xining, Peoples R China;[3]Sinohydro Engn Bur 7 CO, Chengdu, Peoples R China;[4]Univ Civil Engn Transportat & Water Conservancy, Guizhou Inst Technol, Guiyang, Peoples R China

第一机构:Powerchina Railway Construct Investment Grp CO, Beijing, Peoples R China

通信机构:corresponding author), Univ Civil Engn Transportat & Water Conservancy, Guizhou Inst Technol, Guiyang, Peoples R China.|贵州理工学院;

年份:2026

卷号:78

期号:8

起止页码:435-448

外文期刊名:GRADEVINAR

收录:;WOS:【SCI-EXPANDED(收录号:WOS:001884541200002)】;

基金:This study was supported by Research on Key Technologies for Green and Intelligent Construction Control of Super-Large Deep Excavation Pits at Cross-Transfer Metro Stations for Chongqing Rail Transit Line 17 (DJTL-YBXM-2024-03).

语种:英文

外文关键词:cross-transfer; metro station; extra-large deep foundation; mechanical properties; ground subsidence

摘要:Strict control of ground settlement and internal forces within the support structure represents a key technical challenge in the excavation of extra-large deep-foundation pits for cross-transfer metro stations. Based on the field monitoring results of the research section and fundamental geotechnical parameters of the rock mass, two-stage excavation schemes, BZL1 and BZL2, are proposed. The model was validated against the monitoring data. The evolution patterns of the ground settlement and internal forces within the support system forthe two excavation schemes were analysed, and the optimal excavation scheme was selected. The results showed that the maximum error between the numerical simulation and field monitoring data of the ground settlement under the BZL1 excavation scheme was 13.84 %, indicating that the established model was reliable. When the BZL2 scheme for excavating foundation pits was employed, the peak cumulative surface settlement could be reduced by up to 56.7 %, whereas the peak axial force in the cross braces could be reduced by up to 48.14 %. The BZL2 scheme is the preferred option for excavating ultradeep large-scale foundation pits, offering superior safety and economic viability. These findings may serve as a reference for the construction of extra-large deep excavations at cross-transfer underground railway stations.