登录    注册    忘记密码

详细信息

新建突出煤矿“先抽后建”模式与实施路径  ( EI收录)   被引量:4

Model and implementation path of “pumping in advance and then construction”for a new coal and gas outburst mine

文献类型:期刊文献

中文题名:新建突出煤矿“先抽后建”模式与实施路径

英文题名:Model and implementation path of “pumping in advance and then construction”for a new coal and gas outburst mine

作者:曹佐勇 何学秋 王恩元 徐佑林 杜宏 张东亮

第一作者:曹佐勇

通信作者:Wang, En-Yuan

机构:[1]中国矿业大学煤矿瓦斯与火灾防治教育部重点实验室;[2]中国矿业大学安全工程学院;[3]贵州煤矿安全监察局;[4]贵州理工学院矿业工程学院;[5]重庆能源(贵州)煤电有限公司;[6]中煤科工集团西安研究院有限公司

第一机构:中国矿业大学煤矿瓦斯与火灾防治教育部重点实验室,江苏徐州221116

年份:2016

卷号:0

期号:S2

起止页码:425-433

中文期刊名:煤炭学报

外文期刊名:Journal of China Coal Society

收录:CSTPCD;;EI(收录号:20170903401198);Scopus(收录号:2-s2.0-85013910527);北大核心:【北大核心2014】;CSCD:【CSCD2015_2016】;

基金:国家自然科学基金资助项目(51574231);中央高校基本科研业务费专项资金资助项目(2014ZDPY23);江苏高校优势学科建设工程资助项目(PAPD)

语种:中文

中文关键词:新建突出煤矿;煤层气开发;地面井抽采;区域瓦斯治理;先抽后建

外文关键词:Coal;Coal bed methane;Coal deposits;Firedamp;Gas bursts;Gases;Methane;Natural gas wells;Pumps

摘要:针对国家提出的加快煤层气地面开发和推广煤矿"先抽后建"理念,分析了新建突出煤矿"先抽后建"的基本特征,构建了"先抽后建"的时间-空间-安全条件模式模型与政策落实-技术研究-工程实施路径图,并对官寨煤矿工程实例进行了研究。研究得出:煤层气地面井抽采是煤矿区域瓦斯治理的创新举措,是推动实现新建突出煤矿"先抽后建"的有效途径;"先抽后建"模式为科学规划煤层气抽采与矿井建设的工程分区,统筹衔接和协调实施煤层气与煤炭开发;实施路径是在煤矿筹建阶段明确落实"先抽后建"政策的总体方案,根据项目可行性研究的成果,研究编制"先抽后建"的技术实施方案,按照地面钻井-瓦斯先抽-矿井后建的步骤进行"先抽后建"的工程实施。现场工程实践显示,官寨井田煤层气开发与矿井建设工程"先抽后建"方案可行,具有典型的代表性和很好的借鉴意义。
Based on the goal of accelerating the exploring of the coalbed methane (CBM) from the ground and popularizing the philosophy of “pumping in advance and then construction” (PAC) for a new coal and gas outburst mine, the basic characteristics, the model of the condions mode including the time, space and safety (TSS) conditions and the implementation path including the policy, technology and engineering (PTE) are designed, and an engineering example of the Guanzhai colliery is studied in detail. The main research results include the extracting of CBM from the ground well is an innovate countermeasure of controlling the regional gas of the coal mine and the effective way of promoting and realizing the PAC for the new coal mine, which contains the scientific plan for the extraction of the CBM and engineering partition of the coal mine construction, connecting and coordinating the exploitation of the CBM and coal. Also, the implementation path is the overall scheme of definite carrying out the PAC policy in the stage of the plan for the new colliery, combined with the feasibility research results for this project, the application scheme of the PAC technology is determined, which should be execute on the basis of the steps of ground drilling well, pumping the underground gas and building the new coal mine. The obtained research results show that the field technology scheme of exploring the CBM and PAC for the Guanzhai colliery is feasible, which has a typical representation and favorable reference meaning. ? 2016, Editorial Office of Journal of China Coal Society. All right reserved.

参考文献:

正在载入数据...

版权所有©贵州理工学院 重庆维普资讯有限公司 渝B2-20050021-8 
渝公网安备 50019002500408号 违法和不良信息举报中心